Paddington & Slough S&T Faulting & Maintenance

As part of RT Infrastructure Solution’s Network Rail S&T Lot 13 Front Line Labour Framework, RTIS have provided key signalling personnel over a long term period to Network Rail at the Slough, West Ealing and Paddington depots.

Teddington AFA – Telecoms and SISS works

Teddington Station, a key transportation hub in Greater London operated by Southwest Railway, underwent significant upgrades to improve accessibility and modernize its infrastructure.

Amey Treadles Upgrade works

RT Infrastructure Solutions (RTIS) was engaged by Amey to deliver critical treadle modification works at three key level crossings: Codford, Upton Lovell, and Wylye.

Salford Crescent Third Platform Upgrade

RT Infrastructure Solutions (RTIS) successfully delivered a key package of signalling works for the transformative Salford Crescent station upgrade, part of Network Rail’s Manchester and Northwest Transformation Programme (MNTP).

Camp Hill Line Stations

As part of a £61 Million pound scheme to build 3 new stations on the Camp Hill Line to
South Birmingham, RTIS were engaged by VolkerFitzpatick to deliver all the required signalling and power upgrade
works on this major scheme.