East Sussex Re-signalling Scheme
The East Sussex Re-signalling scheme fell under the Sussex & Wessex signalling framework contract awarded to Atkins by Network Rail.
The East Sussex Re-signalling scheme fell under the Sussex & Wessex signalling framework contract awarded to Atkins by Network Rail.
The 4LM Re-signalling Scheme is a long term signalling scheme aimed at increasing capacity on the Circle, District, Hammersmith and Metropolitan lines.
This project was awarded to Alstom to deliver the design, supply, installation and commissioning of the current life expired signalling and power system.
Bardon Level Crossing is a public highways manned barrier situated at 111 miles and 22 chains on the Midland and Continental Route.
This £6m scheme to undertake modifications to Fratton Depot saw RTIS deliver all signalling requirements on behalf of Buckingham Group.
Working with Balfour Beatty, RT Infrastructure Solutions (RTIS) provides highly skilled signalling support for both plain line and switches and crossings (S&C) projects on Network Rail’s infrastructure.