Recent Projects

Since its inception RT Infrastructure Solutions has worked on a multitude of railway projects. These have often been on behalf of first tier railway companies, however RTIS has delivered a number of self managed fixed price projects.Our project list below shows a selection of completed or ongoing rail works. These range in complexity between direct self-managed projects, routine maintenance or the supply of skilled labour.

Key:  Annual Amount 0k - 50k 50k - 250k 250k - 750k Over 750k

 

Customer Contract Start Date End Date
Volker Rail Plumstead 4LM project - Signalling Installation support October 2017 Ongoing
Colas Rail Audley End - SMTH support for PL renewals October 2017 October 2017
Buckingham Group Worcester Parkway - signalling correlation October 2017 October 2017
Atkins Rail Norwich/Yarmouth/Lowestoft signalling blockade October 2017 October 2017
Bombardier 23 x EBI Gate 200 Crossings - modification works October 2017 Ongoing
Colas Rail Great Chesterford S&C - SMTH & signalling installation support September 2017 Ongoing
Volker Rail WAML - signalling installation support September 2017 September 2017
Alstom Bristol Blockade - signalling installation support September 2017 September 2017
Amey Rail Gospel Oak to Barking - signalling installation support September 2017 October 2017
Colas Rail Norwich-Yarmouth-Lowestoft S&C - signalling installation prep works September 2017 October 2017
Volker Rail Felixstowe - signalling correlation support September 2017 October 2017
AM Rail Inverness Depot Project - signalling installation / commissioning September 2017 October 2017
Alstom Redhill - signalling control centre works September 2017 September 2017
Colas Rail Kelvedon S&C - signalling installation support September 2017 October 2017
Carillion Rail Sheffield - signalling installation support August 2017 August 2017
Giffen Group Tyle Hall - signalling installation for VAMOS level crossing August 2017 August 2017
Colas Rail ESK Westerfield Plain Line - SMTH and installation support August 2017 August 2017
Alstom CNES - Installation support July 2017 Ongoing
Siemens Rail Thameslink - Telecoms Installation July 2017 November 2017
Giffen Group Old Dalby - Signalling installation works July 2017 July 2017
Colas Rail East Ham S&C - Signalling installation prep works July 2017 July 2017
Costain Pudding Mill Lane - Cable changeovers under SMTH July 2017 July 2017
Siemens Rail Cable Pulling & Civils Works - Various UK locations June 2017 Ongoing
Volker Rail NWEP - SMTH & G110 support June 2017 September 2017
Colas Rail Waterloo - Support for point build ups June 2017 October 2017
AM Rail Inverness - SMTH cover for IBJ renewals June 2017 June 2017
Atkins Rail Feltham - Installation prep support June 2017 June 2017
Colas Rail Dartford S&C - Installation prep support and core commissioning June 2017 October 2017
Colas Rail Gidea Park - Installation support June 2017 June 2017
Carillion Rail North Pole Depot - G110 support June 2017 June 2017
Volker Rail Doncaster - Location Case Pre-fabrication works May 2017 June 2017
Colas Rail Wembley - Points installation works May 2017 May 2017
Costain Shenfield - Renewal & Test of 72 x Multi Core Cables May 2017 May 2017
Alstom Widnes - Signalling Commissioning May 2017 May 2017
Siemens Oxford Re-signalling - Installation Support May 2017 Ongoing
Bombardier 3 x User Works Crossings - New panel and wiring changes May 2017 Ongoing
Colas Rail High Output - SMTH teams for support to HOBC May 2017 Ongoing
Volker Rail WAML - Installation support for various signalling works May 2017 July 2017
Colas Rail Waterloo - Installation support for signalling modifications May 2017 Ongoing
Colas Rail Hunts Mill - SMTH support for testing M63 and HW's May 2017 May 2017
Colas Rail Billericay - SMTH support to Plain Line Works May 2017 May 2017
Colas Rail Purfleet - Core S&C Commissioning Works May 2017 May 2017
Colas Rail Goodmayes - SMTH support to Plain Line Works April 2017 April 2017
Colas Rail Bury Sugar Beet - SMTH support to Plain Line Works April 2017 April 2017
Carillion Rail Reading - SMTH support to support civils activities March 2017 March 2017
Buckingham Group Worcester - Signalling cable surveys March 2017 March 2017
Colas Rail Purfleet - Signalling installation for S&C renewal March 2017 March 2017
Atkins Rail Wrexham & Chester - Signalling installation for OD Level Crossings March 2017 April 2017
Colas Rail Forest Gate - Signalling installation for S&C renewal February 2017 March 2017
Colas Rail Reedham - SMTH & signalling support for Plain Line February 2017 March 2017
Bombardier National - Signalling support for EBI Gate 200 System February 2017 Ongoing
Carillion Rail Queenstown Road - Signalling commissioning support February 2017 February 2017
Carillion Rail Kettering - IBCL points set up February 2017 March 2017
Atkins Rail Feltham - Signalling installation support February 2017 February 2017
Siemens Rail New Cross Gate - Signalling installation February 2017 Ongoing
Colas Rail Thorpe - SMTH test support teams Plain Line Track Renewals February 2017 February 2017
Atkins Rail Eastbourne - SMTH support for AWS moves February 2017 February 2017
Atkins Rail East Kent - Signalling installation support February 2017 March 2017
Carillion Rail Acton Wells - SMTH support for Plain Line Renewals February 2017 February 2017
AM Rail Inverness IEP Depot - Signalling correlation February 2017 February 2017
Keltbray Rail Crossrail - 24/7 SMTH support for points/cable diversions February 2017 May 2017
Haigh Rail Birmingham New Street - SMTH support for Track Renewals February 2017 March 2017
Alstom SES - Signalling installation for stage 3.3 February 2017 March 2017
Colas Rail Broxbourne - SMTH support for Plain Line Renewals January 2017 February 2017
Siemens Rail Port Talbot - TIC support for Major Re-signalling January 2017 June 2017
Alstom Rail CNES/Cross Rail - installation support for Xmas Commissionings December 2016 December 2016
Keltbray Rail Shenfield - IBCL Points Installation December 2016 December 2016
Colas Rail Wembley Cross Over - SMTH support for civils works December 2016 December 2016
Amey Rail Acton - MOD 1 test support December 2016 December 2016
Siemens Rail Plumstead - Signalling Installation Works December 2016 Ongoing
Colas Rail Euston - SMTH support for civils works November 2016 November 2016
Haigh Rail Watford - SMTH support for IBJ renewals works November 2016 December 2016
Alstom Ely to Norwich - Level Crossing works November 2016 November 2016
Siemens Manchester - MOD 5 testing support November 2016 November 2016
Colas Rail New Cross - Installation Prep Works November 2016 December 2016
Alstom Ely to Norwich - Level Crossing works November 2016 November 2016
Amey Rail S&C North - Installation Support October 2016 May 2017
Haigh Rail Bromsgrove -Refit & Renew 7 ends HW points October 2016 November 2016
Carillion Rail OCCPA - SMTH Points works October 2016 Ongoing
Siemens Bromsgrove - Installation support October 2016 November 2016
Colas Rail New Cross - Installation & SMTH testing works October 2016 October 2016
Alstom Nottingham - Commissioning Support October 2016 October 2016
Alstom CNES - Signalling Installation support October 2016 March 2017
Colas Rail Moreton Cutting - FPL of Hy-drives October 2016 October 2016
Colas Rail Epsom - FPL testing of IBCL points (250) October 2016 October 2016
Carillion Rail Acton - IBCL points testing October 2016 October 2016
Colas Rail Selhurst - signalling installation support September 2016 October 2016
Carillion Rail Bicester - IBCL Points set up September 2016 September 2016
Carillion Rail Horsham - IBCL Points set up September 2016 September 2016
Carillion Rail Gainsborough - SMTH support to P Way works August 2016 September 2016
Atkins Rail East Kent - signalling installation works August 2016 August 2016
Atkins Rail Feltham Blockade - signalling installation works July 2016 July 2016
Alstom Abbey Wood - signalling installation works July 2016 September 2016
Alstom Nottingham - Signalling installation commissioning prep works July 2016 November 2016
Carillion Rail Oxford - SMTH testing after Pway works July 2016 Ongoing
Alstom Ilford - Signalling commissioning support June 2016 July 2016
Carillion Rail Wilnecote Station - SMTH testing after Pway works June 2016 June 2016
Amey Rail Leagrave - Signalling installation works June 2016 June 2016
Colas Rail Chislehurst - Signalling installation works June 2016 July 2016
Colas Rail Malvern Wells - Signalling installation for S&C renewal June 2016 July 2016
DB Schenker London Gateway - Installation of new HW points machine June 2016 June 2016
Atkins Rail Eastbourne - SMTH testing of HW points and tracks May 2016 May 2016
Colas Rail Purfleet - IBCL points set up & testing May 2016 May 2016
Carillion Rail Corby North - SMTH support IBCL testing May 2016 May 2016
Carillion Rail Kettering - SMTH support TI21 testing May 2016 Ongoing
RJ Power Group Three Bridges - SMTH support for Earthing works May 2016 May 2016
Amey Rail Mountsorrel - Signalling installation support May 2016 May 2016
Alstom Abbey Wood - SES signalling installation support May 2016 June 2016
Alstom Shenfield - CNES signalling installation support May 2016 July 2016
Alstom OCCPA - Signalling support for points commissioning April 2016 April 2016
Colas Rail March East - Point Fitter support for IBCL points set up April 2016 April 2016
Atkins Rail Streatham Vic 2 - Signalling support for commissioning April 2016 April 2016
Carillion Rail Skipton - SMTH support for Plain Line Renewals April 2016 April 2016
Carillion Rail Oxford - SMTH support for PWay works April 2016 April 2016
Met Systems Earls Court - Installation & Test/Commissioning March 2016 March 2016
Atkins Rail Stafford Re-signalling - MOD 3BL & MOD 5 commissioning support March 2016 March 2016
Atkins Rail East Kent Commissioning - Signalling installation support March 2016 March 2016
Colas Rail Millbrook - SMTH support (IBCL) for S&C works March 2016 March 2016
Colas Rail Battersea - Relay Room wiring changes March 2016 March 2016
Colas Rail Teignmouth - Signalling Installation support March 2016 March 2016
Signalling Solutions Swindon - Stage 2C TIC commissioning support February 2016 February 2016
Amey Rail Newark Castle - Signalling Installation support February 2016 February 2016
Carillion Rail Acton - IBCL points set up & SMTH test February 2016 February 2016
Colas Rail March East - S&C Renewals signalling installation prep works February 2016 June 2016
Amey Rail Ferryhill/Durham - S&C Renewals installation support January 2016 January 2016
Network Rail Horsham - HVI Track circuit upgrades January 2016 June 2016
Signalling Solutions Swindon Re-signalling - Stage 2B Commissioning support January 2016 January 2016
Signalling Solutions Paddington - Signalling Commissioning support December 2015 December 2015
Amey Rail Doncaster Marshgate - Signalling installation works December 2015 December 2015
Keltbray Rail Gidea Park - SMTH disconnections / reconnections December 2015 December 2015
Keltbray Rail Brentwood - 2244 A&B points SMTH cover for drainage works December 2015 December 2015
Signalling Solutions Maidenhead - Signalling Installation Works December 2015 December 2015
Carillion Rail Bowling Tunnel - AZLM 70/30'S SMTH support for Plain Line Renewals December 2015 December 2015
Carillion Rail Argyle Street - SMTH support for Plain Line Renewals November 2015 November 2015
Signalling Solutions Bristol Re-signalling Stage 2 (200) - Signalling Installation November 2015 Ongoing
Network Rail Herne Hill - LED Signal Head Replacements November 2015 November 2015
Network Rail Grain - SMTH testing of Mechanical Signal Wire & EBI 200 tracks November 2015 November 2015
Signalling Solutions Swindon - MOD 1 test support November 2015 November 2015
Keltbray Rail Crossrail GE Stations - SMTH cover for station works October 2015 Ongoing 2015
Babcock Rail Gainsborough - 48 core Cable Signalling Installation Support October 2015 October 2015
Babcock Rail Ribblehead Station - MOD 5 Commissioning Support October 2015 October 2015
Signalling Solutions South East Spur - Signalling Installation Works October 2015 April 2016
Carillion Rail Kirkstall - SMTH support for Plain Line Renewals October 2015 November 2015
Carillion Rail OOCPA - SMTH support for civils works September 2015 September 2015
Atkins Rail Plumpton Level Crossing - Signalling support for LX works September 2015 October 2015
Signalling Solutions Chadwell Heath - Signalling support for cable containment works September 2015 September 2015
Keltbray Rail Chadwell Heath - SMTH support for LOR works August 2015 November 2015
Atkins Rail Stafford Commissioning - Mod 3BL & 5 support August 2015 August 2015
Carillion Rail Great Bowden - SMTH support for Plain Line Renewals August 2015 August 2015
Signalling Solutions Swindon Re-signalling - Signalling Installation Works August 2015 October 2015
Atkins Rail South London Stations - Signalling Installation Works August 2015 August 2015
Signalling Solutions Bristol Re-signalling - Signalling support for Civils Works August 2015 December 2015
Atkins Rail Eastbourne & Farnham - Signalling Modification Works July 2015 October 2015
Carillion Rail Bicester - IBCL/SO Point Fitting Support July 2015 July 2015
Amey Rail Thrumpton - TIC support & SWTH support July 2015 May 2016
Babcock Rail Box Tunnel - SMTH blockade support July 2015 August 2015
Signalling Solutions CNES - signalling installation support July 2015 July 2015
Carillion Rail Cricklewood - Commissioning signalling installation support June 2015 June 2015
Signalling Solutions OOCPA - Signalling installation support June 2015 December 2015
Carillion Rail Brocklesbury - SMTH support for track renewals June 2015 June 2015
Carillion Rail Stourton - SMTH support for track renewals June 2015 June 2015
BAM Nuttall East Croydon - Signalling Cable Installation May 2015 November 2015
Babcock Rail Disley Tunnel - Signalling Installation Support May 2015 May 2015
Carillion Rail Ulceby - SMTH support for Track Renewals May 2015 May 2015
Keltbray Rail Shenfield - Signalling Survey Works May 2015 June 2015
Babcock Rail Moss Level Crossing - Signalling installation support April 2015 April 2015
Signalling Solutions Crossrail West Inner - Installation Support April 2015 May 2015
Siemens Rail Reading Re-signalling - TIC commissioning support April 2015 April 2015
Signalling Solutions Swindon Re-signalling - TIC support March 2015 May 2015
Carillion Rail Cricklewood - Signalling installation works March 2015 May 2015
Keltbray Rail Chadwell Heath - Point Fitting of Wide to Gauge Points March 2015 March 2015
Kier Rail Balcombe - Signalling support for commissioning works March 2015 March 2015
Buckingham Group Ebbw Vale - Signalling Installation & Test/Commissioning March 2015 May 2015
Carillion Rail Cricklewood - Signalling installation support February 2015 February 2015
Carillion Rail Willards Bridge - SMTH support for drainage works February 2015 February 2015
Amey Rail Luton - SMTH support for S&C works February 2015 February 2015
Atkins Rail East Sussex/ Eastbourne - Signalling Commissioning Support February 2015 February 2015
Signalling Solutions Romford - North East Spur installation works February 2015 June 2015
Keltbray Rail Chadwell Heath - SMTH cover for LOR works January 2015 March 2015
DB Schenker Kingsbury - Complete HW points renewal January 2015 January 2015
Signalling Solutions Slough - Signalling Installation Teams January 2015 April 2015
Atkins Rail East Kent - Signalling Supervision for installation works January 2015 September 2015
Carillion Rail Three Bridges - Signalling installation January 2015 January 2015
Atkins Rail East Kent - Xmas installation & point fitting support December 2014 December 2014
Signalling Solutions Crossrail West Stage G - Xmas Commissioning Support December 2014 December 2014
Atkins Rail Vic 2 - Installation Support December 2014 December 2014
Signalling Solutions Kensal Wash - Installation Support December 2014 December 2014
Network Rail Charing Cross - Complete renewal of HW points December 2014 December 2014
Keltbray Rail Chadwell Heath - Complete set up & build of IBCL point machines December 2014 December 2014
Amey Rail Doncaster - Signalling Installation Teams for S&C Works November 2014 July 2015
Atkins Rail Saxmunden - Signalling Installation Works November 2014 December 2014
Carillion Rail Thorne - SMTH support for Plain Line Renewals November 2014 November 2014
Carillion Rail Canal Tunnel - Signalling Installation Works November 2014 February 2015
Amey Rail Doncaster - S&C Renewals Signalling Supervisor November 2014 April 2015
Signalling Solutions Wood Green - Signalling installation teams November 2014 November 2014
Atkins Rail Wales - Barmouth - Signalling installation for Level Crossings November 2014 December 2014
Atkins Rail Twickenham - Signalling installation for ELIX project September 2014 October 2014
Signalling Solutions Stockley - Additional signalling installation support September 2014 December 2014
Carillion Rail Peckfield - SMTH support for Plain Line Renewals September 2014 October 2014
Keltbray Rail Hoo Junction - Complete HW Points Renewal September 2014 September 2014
BAM Nuttall East Lancs Level Crossings - Signalling Installation support September 2014 December 2014
Kelbray Aspire Great Eastern Line - SMTH Support September 2014 March 2015
Kier Rail Kingston Road Bridge - SMTH Support AC Track Testing August 2014 September 2014
Atkins Rail Eastbourne - Signalling Installation August 2014 October 2014
Babcock Rail Peterborough - SMTH Rail Bonding July 2014 August 2014
Signalling Solutions Poole to Wool - SMTH Cable Watching July 2014 August 2014
Atkins Rail East Kent Phase 2 - Signalling Supervision July 2014 December 2014
Balfour Beatty Rail Sandwich - Signalling Installation support July 2014 July 2014
Atkins Rail Wolverhampton Re-signalling - Signalling Installation July 2014 July 2014
Babcock Rail Woodhouse - SMTH Mechanical Support July 2014 July 2014
Carillion Rail Sileby Junction - SMTH support June 2014 June 2014
Atkins Rail Doncaster Level Crossings - Signalling Installation June 2014 June 2014
Kier Rail Hereford - Signalling Correlation June 2014 June 2014
Signalling Solutions Abbey Wood South East Spur - Signalling Enabling works June 2014 August 2014
Atkins Rail Farnham - Signalling installation May 2014 August 2014
Atkins Rail Redditch - Signalling installation May 2014 August 2014
Giffen Group Grantshouse - Signalling installation & Commissioning May 2014 May 2014
Colas Rail Todmorden - Signalling Commissioning Support May 2014 May 2014
Carillion Rail Stockley - Signalling Installation May 2014 May 2014
Atkins Rail East Kent Phase 2 - Signalling installation May 2014 May 2016
Signalling Solutions Brandon - Signalling prep & Commissioning support May 2014 May 2014
Signalling Solutions Poole to Wool - Signalling prep & Commissioning support May 2014 May 2014
Balfour Beatty Rail Norwood Junction & Horley - SMTH support May 2014 May 2014
Babcock Rail Mastermans - SMTH disconnections May 2014 May 2014
Babcock Rail Doncaster - SMTH cover for Drainage Works April 2014 April 2014
Signalling Solutions Finsbury Park - Signalling & SMTH enabling works April 2014 April 2014
Babcock Rail Newark - SMTH Support & Prep for Track Renewals April 2014 April 2014
Atkins Rail TPI Stage 2 Dagenham & Upminster - Signalling Installation works April 2014 Feb 2015
Signalling Solutions Kensal Wash - Signalling Installation works March 2014 March 2014
Atkins Rail North Wales AOCL Level Crossing - Signalling Installation works Feb 2014 Apr 2014
BAM Nuttall Brierfield Level Crossing - Signalling Installation works Feb 2014 Apr 2014
Balfour Beatty Tonbridge Depot - Signalling Installation teams for RT24 works Jan 2014 Apr 2014
Carillion Rail Various Sites - Signalling Installation team for LSE works Jan 2014 Jan 2014
Balfour Beatty Maidenhead - Signalling Planning Manager for PWay works Jan 2014 August 2014
Signalling Solutions Bristol - Signalling installation works Jan 2014 April 2015
Atkins Rail Eastbourne - Signalling installation works Jan 2014 May 2014
Atkins Rail Farnham - Signalling snagging & installation Jan 2014 Feb 2014
Atkins Rail TPI Twickenham Project - Signalling installation Jan 2014 Jan 2014
Signalling Solutions Slough - Signalling installation enabling works Jan 2014 Dec 2014
Signalling Solutions Swindon - Signalling installation works Jan 2014 May 2015
Signalling Solutions Slough & Gatwick - Signalling Commissioning Support works Dec 2013 Dec 2013
Amey Rail Acton - Signalling installation commissioning support Dec 2013 Dec 2013
Signalling Solutions Old Oak Common - Signalling installation works Dec 2013 Dec 2013
Signalling Solutions Oxford Re-signalling - Axle Counter surveys Dec 2013 Apr 2014
Atkins Rail South Wales - AOCL Level Crossing Signalling Installation Dec 2013 Feb 2014
Balfour Beatty Finsbury Park - Signalling Supervisor Sep 2013 Dec 2013
Balfour Beatty Finsbury Park - SMTH Testing for P Way Works Sep 2013 Dec 2013
Carillion Rail Midland Main Line LSE works (Phase 2) - Signalling installation support Oct 2013 Dec 2013
Balfour Beatty Finsbury Park - Points set up Sep 2013 Dec 2013
Atkins Rail EGIP Signalling Scheme - Signalling Installation works Oct 2013 Oct 2013
BAM Nuttall Low Moor Level Crossing - Signalling Installation works Sep 2013 Dec 2013
Carillion Rail Midland Main Line LSE works (Phase 1) - Signalling installation support Sep 2013 Dec 2013
Atkins Rail East Sussex Re-signalling - Signalling Installation Teams Sep 2013 Nov 2013
Atkins Rail Moreton to Luggs - Signalling Installation for Level Crossing works Aug 2013 Sep 2013
Carillion Rail Manton Junction - Signalling installation support Aug 2013 Aug 2013
Balfour Beatty Queenstown Road - SMTH support Aug 2013 Aug 2013
Colas Rail Swindon to Kemble - Signalling Installation works Aug 2013 Sep 2013
Atkins Rail Melton Mowbray - Tranche 15 Sig Installation for LX Crossing Upgrade Aug 2013 Sep 2013
Atkins Rail Walkden - Signalilng Installation Works Jul 2013 Aug 2013
Giffen Group Grantshouse - 650v power upgrade - Signalling Installation works Jul 2013 Dec 2013
Signalling Solutions Bletchley - Removal of redundant signalilng wiring in REB Jun 2013 Jul 2013
Signalling Solutions Nottingham - Signalling Installation Works Jun 2013 Jul 2103
Balfour Beatty Rail Copper Mill Junction - SMTH testing Jun 2013 Jun 2013
MGB Engineering Nottingham - REB Cable Termination & modifications May 2013 Jun 2013
Balfour Beatty Rail Clapton - SMTH Testing May 2013 May 2013
Signalling Construction UK Drax Power Station - SMTH testing and cable jointing May 2013 Jun 2013
Atkins Rail Farnham Re-signalling - Signalling Installation Teams May 2013 Sep 2013
Signalling Solutions Ely to Norwich - Installation and snagging works in REB's & Location Cases May 2013 May 2013
Carillion Rail Old Oak Common - Installation Signalling Supervisor May 2013 Aug 2013
Signalling Solutions Swindon - signalling survey team May 2013 Dec 2013
Carillion Rail Peterborough- Signalling support for comissionning May 2013 May 2013
Babcock Rail Cricklewood - SMTH support for track renewals Apr 2013 Apr 2013
Balfour Beatty Sidcup & Thorpe SMTH support for Track Renewals Apr 2013 Apr 2013
Carillion Rail Peterborough - Installation support for commissioning Apr 2013 Apr 2013
Carillion Rail Cricklewood - Assisting Testers Apr 2013 Apr 2013
May Gurney Northfleet - SWTH commissioning of Signalling assets Apr 2013 Apr 2013
Balfour Beatty Clapton - SMTH support for renewals Apr 2013 Apr 2013
Babcock Rail Burton Salmon - Retford SMTH support for track renewals Apr 2013 Apr 2013
Keltbray Three Bridges - Signalling support for P Way works Apr 2013 Apr 2013
Balfour Beatty Epsom - Diss - Bromley - Bishops Stortford SMTH support for renewals Apr 2013 Apr 2013
Siemens Virginia Water - SMTH Testing support Apr 2013 Apr 2013
Buckingham Group Wakefield - SMTH Cable Slewing Works Apr 2013 Apr 2013
Signalling Solutions Bristol - Signalling Enabling Works Apr 2013 Dec 2013
Babcock Rail Kentish Town - Hull - Croxdale SMTH support for track renewals Apr 2013 Apr 2013
MGB Engineering Gatwick - REB & Location Case works - onsite termination activities Feb 2013 Feb 2013
Colas Rail Gowerton - Signalling Support for Commissioning Blockade Mar 2013 Mar 2013
Carillion Rail Bletchley - Signalling Installation Works Mar 2013 Aug 2013
Balfour Beatty Twickenham - Assisting controlled changeovers Mar 2013 Mar 2013
Carillion Rail St Albans - Signalling support to SWTH works Mar 2013 Mar 2013
Babcock Rail Newcastle & Batley Signalling Support for Track Renewals Mar 2013 Mar 2013
Babcock Rail Bedford - SMTH support for track renewals Mar 2013 Mar 2013
Balfour Beatty Bromley - Epsom - Hastings Mar 2013 Mar 2013
Balfour Beatty Yeovil - Winchfield - Greenwich Tunnel - Sidcup Mar 2013 Mar 2013
Signalling Solutions Langley - Signalling Installation works Feb 2013 Dec 2013
Balfour Beatty Crayford-Ipswich-Lewisham-Hastings SMTH support for Track Renewals Feb 2013 Feb 2013
Babcock Rail Bingley - SMTH support for cable renewals Feb 2013 Feb 2013
Babcock Rail Leeds - Clamplock FPL Feb 2013 Feb 2013
MGB Engineering Nottingham - REB & Location Case works - onsite termination activities Feb 2013 Feb 2013
Babcock Rail Moat Hill Level Crossing - SWTH works Feb 2013 Feb 2013
Balfour Beatty Basingstoke - Ipswich - Yeovil - Gatwick SMTH support for Track Renewals Feb 2013 Feb 2013
May Gurney Westerfield - Point Watching Feb 2013 Feb 2013
MGB Engineering Plymouth -Location Case Fabrication Feb 2013 Feb 2013
Balfour Beatty Rail Tottenham - Sidcup - Seven Kings SMTH & Installation works Feb 2013 Feb 2013
Chiltern Railways Wembley Depot - Tiefenbach Point sensor refurbishment Jan 2013 Jan 2013
Balfour Beatty Rail Hertford - SMTH Disconnections & Reconnections for Track Renewals Jan 2013 Jan 2013
Balfour Beatty Rail Victoria - Three Bridges Signalling Support for Core Renewals Jan 2013 Jan 2013
Babcock Rail Bedford Station - SMTH support for track renewals Jan 2013 Jan 2013
DB Schenker Kingsbury Yard - HW Points refurbishment & test Jan 2013 Jan 2013
Babcock Rail Harrogate - SWTH commissioning support Jan 2013 Jan 2013
Chiltern Railways Wembley - Points modification works Jan 2013 Jan 2013
Volker Fitzpatrick North Pole Depot - Recovery of all signalling assets Jan 2013 Feb 2013
May Gurney Saxmundham - Installation support for Treadle Installation Oct 2012 Oct 2012
May Gurney Commissioning Support for East Suffolk Line Oct 2012 Oct 2012
Buckingham Group Mosely Station - SMTH cover for Cable Slew Oct 2012 Oct 2012
Balfour Beatty Rail Fishbourne - SMTH Disconnections & Reconnections for Track Renewals Oct 2012 Oct 2012
Balfour Beatty Rail Hertford - SMTH Disconnections & Reconnections for Track Renewals Oct 2012 Oct 2012
Babcock Rail Hellifield - Signalling Fault Cover for Mechanical Works Oct 2012 Oct 2012
Bombardier Hockham Road - Installation & Commission of User Works Crossing Oct 2012 Oct 2012
Chiltern Railways Depot Maintenance for signalling assets Sep 2012 Ongoing
Signalling Solutions Maidenhead - Signalling Surveys Sep 2012 Jan 2013
Balfour Beatty Rail Richmond - Signalling Installation works Sep 2012 Sep 2012
Volker Fitzpatrick Felixstowe Port - Signalling Installation / Test & Commissioning Sep 2012 May 2013
TES Depot Maintenance for signalling assets Sep 2012 April 2014
EAMS Old Doalby Test Track - Signalling works Sep 2012 Sep 2012
Kent PHK Installation & SWTH support for Transformer modifications Sep 2012 Jul 2013
Signalling Solutions Fabrication of Location Cases for Stockley Sep 2012 Dec 2012
Signalling Solutions Stockley - Signalling Installation Works Sep 2012 Dec 2012
DB Schenker Depot Maintenance for signalling assets Sep 2012 Ongoing
Signalling Solutions Finsbury Park - Signalling Supervisor Sep 2012 Aug 2013
Signalling Solutions Finsbury Park - SMTH Testing for P Way Works Sep 2012 Aug 2013
CML Ltd SMTH support for cable slews Sep 2012 Oct 2012
Signalling Solutions Bletchley - Signalling Installation Works Sep 2012 Apr 2013
Signalling Solutions Ely to Norwich - Signalling Installation Works Sep 2012 Apr 2013
Dyer & Butler Braintree Cattle Creep - Signalling Support for civils works Sep 2012 Oct 2012